Additionally, CLF also required an 8’ x 8’ (2.4m
x 2.4m) gatehouse which PK was able to select and convert
from their extensive stock of reconditioned modular buildings
available for hire or purchase.
CLF is a new roll-on, roll-off freight ferry terminal operating
between Liverpool and Dublin and Ray Dawson the terminal manager
had a six week leadtime to get the new business up and running.
"I know that the team at PK worked around the clock,
including a bank holiday, to ensure that my project timescales
were met", explained Mr Dawson. "I had some basic
designs for the buildings which PK accurately converted into
CAD drawings and I have to say that I am extremely impressed
with the overall quality of build."
CLF designed the reception office specifically for in-gating
and out-gating drop trailer and driver accompanied vehicles.
The office accommodation has been designed with enough
space to cope with future expansion plans.
"PK Accommodation proved their adaptability and flexibility
in supplying me with exactly what I needed, on time,"
commented Mr Dawson. "Nothing was too much trouble for
the team at PK to deal with." |